Robust Partner of Industry

   
PROJECTS IN PROGRESS
SOLUTION PARTNERS

Turkerler Geothermal Plant Turnkey MV-LV and DCS Control System Works

25/07/2013 - 30/04/2014 [9 Months]

Turkerler Geothermal Inc. 's Manisa in Alaşehir installation started 23 MW JES (Geothermal Power Plant) project turnkey way all LV-MV supply of equipment and cabling, OG cell procurement and installation along with all instrumentation supply, installation and all hot redundant PCS 7 plant - DCS system established BOP (Balance of Plant) and the energy of SCADA and DCS programming work to be done will be done by DELTA PROSES
 
The plant used to generate electricity which will be about 169.6 ° C and 1,376 tons / hour flow in the geothermal fluid; plant output 88.5 ° C as a 1429 tonnes / hour flow of transmission lines and one reserve 4 530 kW injection pump with the support offering, will be pressed back. 
 
Plant commissioning is planned in April 2014.

 
 
 
Copyright Delta Proses Otomasyon Kontrol & Elektronik Sistemleri ® 2012
Pictures, documents and all kinds of media used in this site are original and cannot be used without explicit written consent from DELTA PROSES. All usage rights belong to DELTA PROSES.
Delta Proses Automation is the authorized solution partner automation of Siemens.