Denizli City Water Distribution Network Project
January 2015 - February 2016
[13 Months]
Denizli City Drinking Water and Storm Water Distribution and Monitoring System project, turnkey electrical and control system works are given by ABENGOA to DELTA PROSES. ABENGOA is Spain's leading engineering and contracting company. The project started in January 2015, while the finish is planned for February 2016. This major project is complete, all data can be monitored remotely by the control center will be built on the entire drinking water network of Denizli can be controlled. The quality of water will be monitored continuously by water analyzer instruments. Water distribution system control devices will be automatically redirected by VLTs.
150 pump stations in different locations, deep wells and all instrumentation supply and installation of the reservoir, RT supply for each location, installation and programming, electrical works, panel manufacturing are covered by the scope of the project. The main control center via GPRS collection of data from RTU and SCADA screen Barcode Wall system will be created. Engineering design and construction of all jobs outside MECHANICAL jobs, material supply and installation commissioning of the system will be carried out by DELTA PROSES.
|