Saray Holding Greeneco Jes3 Geothermal Power Plant

2017

The turnkey project of JES 3 Power Plant Electricity and Automation works of Greeneco Geothermal Energy Generation Co., which is an energy subsidiary of Saray Holding, is carried out by Delta Process. Within the scope of the project, power plant, BOP and ORC electrical design, field assembly, instrumentation, DCS-Scada engineering and commissioning works are done. Siemens PCS7 platform was used as the control system of the project. 90,000 direct man-hours have been spent in the field assembly of the project.


 
 
 