Abalıoğlu Feed Inc.100t/h Feed Factory in Mersin
15/05/2010 - 10/01/2011
Abalioglu A.Ş. Tarsus - Mersin has constructed a 100 tons / h feed mill capacity production plant. All the electrical and automation works are being carried out by DELTA PROSES. Construction began in Yenice town of Tarsus district of Mersin at 2009. Planned annual production capacity is 350,000 tons of feed. Regional demand for food exports to Middle East countries, as well as targeted. Poultry and cattle feed plant to be established on an area of 38,000 sqm.
Process Information:
• Raw Material Unloading System
• Dosing System
• Feed Mill, Mixer and Transfer Routes
• Pellet Mill-1 and Transfer Routes
• Pellet Mill-2 and Transfer Routes
• Packaging - Bulk Load Line
• Fluid Tank Control
• Energy Monitoring and Control
Automation Architecture:
• 1 Windows 2008 Server and SQL Server
• 2 Control Room SCADA Workstation
• 2-Piece Press Machine SCADA Workstation
• 1 pc Liquid Pipeline SCADA Workstation
• Master of Schneider Electric Quantum PLC
• CAN OPEN Contact: Cruise Control and Softstarter Controls
• Ethernet COMMUNICATION PLC Remote IO Modules
Engineering:
• Design and Design Automation System
• PLC Programming
• SCADA Programming
• Database Programming
• Testing and Commissioning
Electric Equipment:
• Low Voltage Distribution Boards
• Compensation Boards
• MCC Panels
• PLC Panels
• PLC Remote IO Panels
Electric Equipment:
• MV SCHNEIDER ELECTRIC Cells
ABB Transformer • 2 1600kVA
• Low Voltage Distribution Boards
• Compensation Boards
• MCC Panels
• PLC Panels
• PLC Remote IO Panels
• Field Cable - Pan Facilities
• Lightning and the Flight Warning System
|