Georgia State Gori City Highway Tunnel Electromechanical Works
In the state of Georgia 850m length of Gori double tube highway tunnel complete Automation - Control Systems, Electrical designs and Main Distribution-MCC-PLC Panel Manufacturing Works will be carried out by DELTA PROSES.
In the project complete Automation - Control Systems, Image Processing Integration, Traffic Control, PLC and Scada Programming will be engineered. The PLC system wil be designed as Hot Redundancy structure as formerly applied by DELTA PROSES in previous Tunnels. This project scope is a bit different and complex in terms of engineering wise due to Image processing integration and Traffic Control systems will uniquely be done by DELTA PROSES and all control system will be monitored in one single Scada.
Electrical designs are already completed. 51 pcs of Electrical panels will be manufactured in DELTA PROSES panel workshop.
|